2017 Sanitary Sewer Lining Program

Overview


The Township began installing liners in sanitary sewer mains, which are difficult to maintain due to access constraints, root intrusion problems, frequent backup problems and/or pipe failures in 2013. Liners also seal pipe joints, preventing groundwater from entering the sewer main (known as "infiltration"). Installing liners rather than new pipe minimizes the cost because the liners do not require excavation of the roadway or easement area, disturbance of existing water, storm sewer or other private utilities or disruption of service to customers. 
The 2017 Sanitary Sewer Lining Program includes the following areas:
• Bellaire
• Eastwood Manor 
 
 
All of the sanitary sewer mains recommended for lining in the 2017 Program are prone to root intrusion problems, have cracks in the pipe, misaligned joints or pipe failures which create flow restrictions or prevent routine maintenance operations.

These improvements have been a major factor (along with regular cleaning and inspection by Public Works Department) in the reduction of sanitary sewer main backups. The liners prevent roots from entering the main through joints, cracks or broken pipes and improving flow by providing a smooth interior surface for the pipe. The liners also seal the sewer main in areas with high ground water conditions, which reduces the Township's sanitary sewer flow and thus billing from the Metropolitan Council Environmental Services.
Sanitary Sewer Lining Project Map
Cured in Place Pipe (CIPP) Process
  1. Pre-inspection of the pipe to locate obstructions that would need to be internally removed, locate services, and determine which services are active.
  2. Measurements of the line's length, diameter, and depth are taken.
  3. The data collected is then brought back to the contractors facility where the process of pipe design calculations is performed with our software. This critical data is required to design a CIPP liner that, when installed, will meet or exceed ASTM (American Society of Testing and Materials) standards.
  4. The data is then sent to the contractors wet out facility. Wet out is the process of impregnating a high quality felt tube with a calculated amount of catalyzed resin.
  5. After wet out, the product is loaded and cooled down for proper shipment to the job site.
  6. Installation can be done by an inversion process or a pulled in place process.
  7. Water is used to carefully pressurize the liner.
  8. The catalyzed resin is heat activated; therefore the contractor uses steam to cure the liner. (Careful monitoring of temperatures and pressures are required to assure the line is properly cured.)
  9. With proper cool down, there is now a new pipe within the old pipe. The old pipe is no longer needed for structural support.
  10. The next step in the process is reinstatement of services. This task is an art in itself, requiring specialized equipment and trained personnel.
  11. A robot is driven down the line and extends an arm with a high speed carbide tool on it to cut out service taps for reinstatement.

Project Updates

August 21-23: Cured in Place Pipe (CIPP) installation process is located in the following areas:                                                                                                                                                     - South Shore Blvd from the East bend of the road to the West                                                           - Arbor Drive from County Road F to the North                                                                                      - County Road F from Portland Ave to Arbor Drive

July 11 - Cured in Place Pipe (CIPP) installation process is located in the following areas:            - South Shore easement between South Shore Blvd (just West of East County Line Rd) to Arbor Dr - Lakewood Ave from Ralph Street to County Road F                                                                           - Intersection of County Road F and Portland Ave

July 10 - Cured in Place Pipe (CIPP) installation process is located in the following areas:            - Martin Way from Randy Ave to East County Line Road                                                                      - South Shore Blvd at the East end near East County Line Road

July 7 - Cured in Place Pipe (CIPP) installation process is located in the following areas:            - Roth Place from Bellaire to the South Township limit (Grand Ave)

July 6 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Randy Ave from Lakewood Ave to East of Stacker Blvd                                                                     - Effress Road from Martin Way to the dead end                                                                                   - County Road F from Lakewood Ave to 1/2 way to Bellaire Ave

July 5 - Cured in Place Pipe (CIPP) installation process is located in the following areas:                  - School Property from County Road F to the South end of the School                                                                                     

June 29 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Randy Ave from Stacker Blvd to Martin Way                                                                                      - Bellaire Ave from Roth Place to the Southern boundary of the Township

June 28 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Birchknoll Drive from County Road F to 1/3 of the way to the cul-de-sac                                          - Birchknoll Drive from the cul-de-sac to 1/3 of the way North                                                               - Martin Way from East of Portland Ave to Randy Ave                                                                         - Roth Place from Randy Ave to the East ending at the Township's Boundary

June 27 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Bellaire Beach area (this area will be done in the morning to minimize impact to beach visitors)      - Portland Ave to the 1/2 way point of the street length                                                                         - Portland Ave from the bend in the road to Martin Way                                                                       - County Road F from East County Line Road to Birchknoll Drive

June 26 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - County Road F from East County Line Road to Birchknoll Drive (continued into June 27)                - County Road F from Portland Ave to 1/3 of the way to Lakewood Ave                                               - County Road F from Lakewood Ave to 1/3 of the way to Portland Ave

June 22 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Lakewood Ave from Martin Way to Randy Ave                                                                                  - School easement from Martin Way to North to middle of school property                                          - Homewood Ave from South Shore Blvd 1/2 way to Arbor Drive 

June 21 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Homewood Ave from Martin Way to Roth Place                                                                                - South Shore Blvd from Forest Court to East of Summit Lane                                                            - Effress Rd from Martin Way to North of Lakewood Ave

June 20 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Martin Way from Lakewood Ave to Portland Ave                                                                               - Lakewood Ave from Randy Ave to 1/3 of the way to Effress Rd                                                        - Stacker Blvd from Stacker Pl (East connection) to Randy Ave

June 19 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Lakewood Ave from East of Randy Ave to Effress Road.

June 15 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Bellaire Ave from Martin Way North of Roth Place                                                                             - Arbor Drive from Glen Oaks Ave to Forest Court                                                                                - Arbor Drive from Forest Court to Summit Lane                                                                                   - South Shore Blvd side yard easement West of East County Line Road (time permitting)

June 14 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - South Shore Blvd from East of Summit Lane to East of Hillaire Road                                 - Lakewood Ave from Ralph Street to Arbor Drive                                                                                - Stacker Place from Stacker Boulevard through Horseshoe Court   

 June 13 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Arbor Drive from East of Hillaire Road to the East bend in the road                                                  - Arbor Drive from Summit Lane to Hillarie Road                                                                                  - Stacker Blvd from Lakewood Ave to West of Portland Ave

June 12 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Glen Oaks Ave from South Shore Blvd to Arbor Drive

June 9 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - South Shore Blvd from Lakewood Ave to Glen Oaks Ave                                                                   - South Shore Blvd from Glen Oaks Ave to Forest Court

June 8 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Forest Court  from South Shore Blvd to Arbor Drive                                                                          - Sections of South Shore Boulevard from Bellaire Avenue to Glen Oaks Avenue                              - Summit Lane from South Shore Blvd to 3/4 of the way to Arbor Drive 

June 7 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Hillaire Road from South Shore Blvd to Arbor Drive                                                                           - Lakewood Avenue from South Shore Blvd to Arbor Drive                                                                   - Glen Oaks from South Shore Blvd to Arbor Drive                                                                               - Summit Lane from South Shore Blvd to Arbor Drive (Continued into June 8)                                    - Remainder of Bellaire Avenue from County Road F towards South Shore Blvd

June 6 - Cured in Place Pipe (CIPP) installation process is located in the following areas:       - Bellaire Avenue between County Road F and South Shore Blvd                                                      - Bellaire Beach Area.

June 5 - Cured in Place Pipe (CIPP) installation process starts beginning with Homewood Ave.
  
Prior to June 5 - Cured in Place Pipe (CIPP) steps 1-5 have been completed.

Project Schedule


Receive Bids                                                    February 15, 2017
Town Board Awarded Contract                        February 22, 2017
Final Completion                                              Fall 2017